神华宁煤甲醇厂克劳斯硫回收系统硫堵原因分析
Causes Analysis of Sulfur Blockage in Claus Sulfur Recovery System in Shenhua NCPP Methanol Plant
-
摘要: 神华宁煤甲醇厂硫回收装置于2008年6月投产,在运行过程中出现液硫管线堵塞和尾气管线带硫的现象,后经工艺操作改进和设备改造,解决了上述问题。Abstract: Sulfur recovery unit in Shenhua NCPP Methanol Plant went into production in June, 2008. In the process of operation, the blockage of liquid sulfur pipeline occurred and sulfur existed in tail gas pipe. Through the process operation improvement and equipment modification, the above problems have been solved.