Advanced Search
Guo Haiyan, Zhang Weisen. Technical analysis and operation status of LNG plant in ZhuhaiJ. Chemical Engineering of Oil & Gas, 2012, 41(1): 43-47. DOI: 10.3969/j.issn.1007-3426.2012.01.009
Citation: Guo Haiyan, Zhang Weisen. Technical analysis and operation status of LNG plant in ZhuhaiJ. Chemical Engineering of Oil & Gas, 2012, 41(1): 43-47. DOI: 10.3969/j.issn.1007-3426.2012.01.009

Technical analysis and operation status of LNG plant in Zhuhai

  • As the first LNG plant in China National Ocean Oil Company (CNOOC), Zhuhai LNG plant has adopted advanced technology and equipments with high home-manufactured degree. The paper introduced the technical processes in the Zhuhai LNG plant of CNOOC, including MDEA decarbonization process, 4A molecular sieve deep dehydration process, PRICO mixture refrigerant process and LNG storage process, analyzed the plant operating status, summarized the problems exposed in practical operation and proposed the solutions. It could provide technical reference for domestic similar LNG devices.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return