Advanced Search
Wang Jian, Yu Zehan, Luo Bin, . Evaluation on Production and Operation in No.1 Natural Gas Processing Plant of CNPC International(Turkmenistan)J. Chemical Engineering of Oil & Gas, 2011, 40(S1): 18-21,7,8.
Citation: Wang Jian, Yu Zehan, Luo Bin, . Evaluation on Production and Operation in No.1 Natural Gas Processing Plant of CNPC International(Turkmenistan)J. Chemical Engineering of Oil & Gas, 2011, 40(S1): 18-21,7,8.

Evaluation on Production and Operation in No.1 Natural Gas Processing Plant of CNPC International(Turkmenistan)

  • No.1 natural gas processing plant of CNPC International(Turkmenistan) went into operation on December 14th,2009.Until now,it has been safely operated for nearly two years.This article introduces startup,trial operation and process design of the plant in detail,and solves existing problems through process evaluation.All of which can provide some experience for the design,construction,operation and management of other similar projects.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return